Step
|
Action
|
Result
|
---|---|---|
1
|
To launch OS Loader, click Start → Programs → EcoStruxure Control Expert → OS Loader.
|
The Welcome window is displayed.
|
2
|
Keep the default settings of the context file and proceed to the next step by clicking Next....
|
The Communication Protocol window is displayed.
|
3
|
Select the driver to be used for communication between the PC and the PLC.
Proceed to the next step by clicking Next....
|
The protocol window is displayed.
|
4
|
As Device Type:
Remark 1: for the Local Head, the Slot Number indicates the position of the target module in the rack.
Remark 2: for the Remote I/O Drop, the Slot Number indicates the position of the target module in the rack and the Drop Number indicates the remote target module address.
|
|
5
|
For a Premium processor, click Connect.
For an Ethernet port:
|
In the Device area the active node Node: SYS-PLC is displayed (Premium).
|
6
|
Select the active node Node: SYS-PLC.
Remark: If the PLC is not stopped at this moment, the Stop PLC button can be used.
Proceed to the next step by clicking Next....
|
The Operation window is displayed.
|
7
|
Select Download OS to device, click Browse... and select the file..
|
|
8
|
Proceed to the next step by clicking Next....
|
A message is displayed.
|
9
|
Click OK.
Green markers must be present. If not, the selected file and device are incompatible. The filename and device name must be identical.
|
The File and Device Info window is displayed.
|
10
|
Proceed to the next step by clicking Next....
|
The Summary window is displayed.
|
11
|
Click Download.
|
The Progress - Initialization window is displayed meaning that the intermediate operating system is downloaded to the processor.
|
12
|
When the download is completed, the Progress (100%) window appears, click Close in the different windows to exit OSLoader.
|
|
13
|
For a Premium processor, press the processor Reset button.
|
|
14
|
Re-start OSLoader to download the final OS binary.
Check the new OS version before downloading the final OS binary.
|