Step
|
Action
|
---|---|
1
|
Check that the PLC power supply is switched off.
|
2
|
Install and secure the modules of the base rack.
|
3
|
|
4
|
Wire the PLC power supply and switch the power on.
Note: Once the PLC's power supply has been correctly connected, the software can now be configured.
|