Step
|
Action
|
---|---|
1
|
Modify the application program offline.
|
2
|
Perform Build Project and save.
NOTE: Do not use the Rebuild All Project option because this causes the Standby CPU to go offline when the application program is downloaded. |
3
|
Verify that the Primary and Standby PLCs are in Run Primary CPU and Run Standby CPU modes.
|
4
|
Connect Control Expert to the Primary CPU.
|
5
|
Set the Command Register system bit %SW60.3 to 1.
|
6
|
Connect Control Expert to the Standby CPU and open the modified program.
|
7
|
Download the program and select RUN.
NOTE: Check the controller state and ensure that it is in Run Standby mode. |
8
|
Verify that the Primary and Standby PLCs are in Run Primary CPU and Run Standby CPU modes.
|
9
|
Perform a Switchover.
NOTE: Ensure that the Standby CPU switched to the Primary CPU. |
10
|
Perform an application transfer to the Standby CPU.
|
11
|
Set the Command Register system bit %SW60.3 to 0.
NOTE: The Command Register system bit is then returned to 0 from 1. |
![]() |
UNEXPECTED EQUIPMENT BEHAVIOR
Before transferring a modified application to the Standby CPU:
Failure to follow these instructions can result in death, serious injury, or equipment damage.
|