Overview
You can edit the control project that is associated to a Modicon PAC by using Control Expert Editor, which opens inside the Topology Manager.
It lets you change the configuration of the PAC and perform actions that are not managed by the Topology Manager.
You can edit several control projects simultaneously from the same Topology Manager instance but one control project can only be edited by one user at a time.
For non-M580 controllers, Control Expert Editor opens with full functionality except for some commands of the menu that are not available.
Prerequisites
To be able to edit the control project the analysis must not detect incorrect configurations for the M580 PAC and its dependencies.
Scope of Changes
You can modify the hardware configuration by adding, moving, replacing, and deleting:
Local main and extended backplanes.
Remote main and extended backplanes including EIO adapter modules.
I/O, communication, and other specialized modules.
Power supply modules.
CPU modules (replace only).
You can also create and modify any other part of the control project such as the application, data types and instances. You can configure project settings and options.
Applying Changes to the System Project
Closing Control Expert Editor lets you save and apply changes.
Before you can save changes, the software analyzes the M580 PAC and its dependencies and you need to fix incorrect configurations.
When you save changes, changes to objects that are managed by the Topology Manager are applied to the system project. Other changes are saved to the control project only.
In addition, changes that you have made to the PAC in the system project while the control project was open are applied to the control project.
Undoing Changes in the Topology Manager
Using the command in the Topology Manager may undo changes that you have made to the control project and saved. Before proceeding, open the pane to verify which action will be undone.
Editing and Closing the Control Project
To edit the control project associated to an M580 PAC, proceed as follows.
Step |
Action |
---|---|
1 |
In a physical view or the PAC and select . pane, right-click the rack of theResult: The PAC and its dependencies are analyzed. If no incorrect configuration is detected, the control project opens in Control Expert Editor. |
2 |
Edit the control project. |
3 |
Close Control Expert Editor by clicking the close button of its tab. Result: The PAC and its dependencies are analyzed. If no incorrect configuration is detected, a dialog box prompting you to save changes opens. |
4 |
In the dialog box, click either button:
|