Central Shielding Measures
For the commissioning phase, a large surface area connection should be made between each cable shield and ground (FE/PE rail) directly after the cable enters the switch cabinet.
Static Discharge
Very long bus cables, which have been laid but not yet connected, are discharged as follows.
Step |
Action |
---|---|
1 |
Begin with the static discharge with the INTERBUS plug nearest to the FE/PE rail. |
2 |
Touch the FE/PE rail of the switch cabinet with the metal of the plug case. |
3 |
Then plug the bus plug into the device, but only after this has been statically discharged. |
4 |
Discharge the cable’s other INTERBUS plugs in the same way and then plug these into the device. |
Notes for Connecting the Cable Shield with Earth
NOTE: The metal guide of the
INTERBUS plug is internally connected with the cable shield during
the construction of the cable. If the bus cable plug is plugged into
the module’s INTERBUS interface, a short connection is automatically
established between the shield and PE.