Step
|
Action
|
Results
|
---|---|---|
1
|
Open the Ethernet network configuration screen.
|
|
2
|
In the Module Utilities zone select YES for IO Scanning.
|
|
3
|
Select the I/O Scanning tab.
|
I/O Scanning screen opens.
|
4
|
Enter, on a free line, the IP address for the connection you want to use to communicate with the PRA.
NOTE: The IP address in the I/O Scanning table must be the same as the IP address of the PRA device. |
|
5
|
Enter RD length and WR length on the same line.
|
|
6
|
Validate the I/O Scanning screen.
|
|
7
|
Click on the ... button (that is next to Device Name cell on the same line).
|
The Property box opens.
|
8
|
Select PRA in the Device Type drop-down menu.
|
|
9
|
Enter a Device Name (following the naming rules).
|
|
10
|
You have 2 choices:
NOTE: While the second PRA instance of Control Expert is running no changes can be made to the Ethernet Editor in the first (master) instance of Control Expert. |
Results for both 1. and 2. are:
|
11
|
After the second instance of Control Expert opens:
|
|
12
|
When your PRA application is configured:
NOTE: Later you can build your PRA application by carrying out Step 7. Because the PRA application is saved (embedded) in the master application *.stu file, it is opened. You can then build the PRA application. NOTE: If there is no PRA application in the master *.stu, an empty application is opened (as happens the first time the Launch PRA button is used in the Property box) |
|
13
|
Build your Control Expert application.
|
|
14
|
STOP the PLC.
|
|
15
|
Transfer:
|
|
16
|
RUN your application in the PLC.
|
|
Step
|
Action
|
---|---|
1
|
From the Control Expert I/O Scanning table using the ... button, open an existing PRA application.
|
2
|
In the second Control Expert instance, save the existing PRA application with a new name as a *.sta or .xef file.
|
3
|
Close this second Control Expert instance.
|
4
|
In the Control Expert I/O Scanning table create a new PRA application on a new line.
|
5
|
Import or Open the *.xef or *.sta file previously saved.
|
6
|
If desired, build the new PRA application and transfer it to the PRA device.
|
7
|
Close the second Control Expert instance.
|