Step
|
Action
|
---|---|
1
|
Use a graphic method based on an indexed response, such as the Broida method. This directly provides the parameters for a first order model with pure delay, in order to identify the process model.
|
2
|
Enhance the adjustment by running the IMC loop controller in automatic mode.
|
3
|
To check whether the model is adapted to the process, set CL_PERF to 1.0 (time constant of closed loop = time constant of open loop).
|
4
|
Proceed to the point of operation and run the loop controller in automatic mode.
|
5
|
Carry out a setpoint step function
![]() Result: If the model parameters are correct, the measurement should rejoin the setpoint without overflow and the OUT_MAN command signal should be almost one division. If this is not the case, a correction must be made, which means:
|