Transferring a Safety Project from Control Expert to the Safety PAC
You can use the Control Expert to the PAC when:
command to transfer the project fromControl Expert is connected in programming mode to the M580 safety PAC, and
A project is open in Control Expert, and
All PAC tasks are in STOP state.
Transferring a Safety Project from the Safety PAC to Control Expert
Similarly, you can use the Control Expert when:
command to transfer the project from the PAC toControl Expert is connected in programming mode to the M580 safety PAC, and
No project is open in Control Expert.
You can transfer content relating to any task (SAFE, MAST, FAST, AUX0, or AUX1) in either safety or maintenance operating mode.
Importing Projects and Code Sections in Control Expert
Control Expert Safety supports to import both entire projects (via ) and code sections (via or ), subject to the following conditions:
Only functions or function block types, which exist in either the safety library (
) or the custom library ( , can be included in a code section handled by the SAFE task.Only functions or function block types, which exist in libraries other than the safety library, can be included in a non-SAFE code section handled by a process task (MAST, FAST, AUX0, or AUX1) .