Precautions to be taken when replacing an Atrium processor
(Original Document)
Important
WARNING
UNEXPECTED EQUIPMENT OPERATION
If the Atrium processor is being replaced by another processor which is not blank (the processor has already been programmed and contains an application), the power for all the PLC station’s control units must be switched off.
Before restoring power to the control units, check that the processor contains the required application.
Failure to follow these instructions can result in death, serious injury, or equipment damage.