Important
WARNING | |
---|---|
UNEXPECTED EQUIPMENT OPERATION If the PCX P57 processor is being replaced by another
processor which is not blank (the processor has already been programmed
and contains an application), the power for all the PLC station’s
control units must be switched off. Before restoring power to the control units, check that
the processor contains the required application. Failure to follow these instructions can result in death, serious injury, or equipment damage. |